A Close Look at Preparing Raw Land in Texas to Build Homes!
The process of residential site preparation involves multiple steps to get to the point where construction can begin.
From the first phase of land clearing to the final one of digging for the foundation, the process is essentially the same for all projects, although some site development efforts may require more work than others.
Yet before any excavation services or installment of utilities or pouring of a foundation can happen, the raw land must be well prepared by converting it from wild land into a clean, cleared building lot.
Brush Clearing And Tree Removal
Starting with a patch of raw untouched ground, land clearing is the first major step in creating a suitable site on which a home can be built.
Whether this ground is densely wooded or holds only a few trees, brush clearing and tree removal must happen first to make the site workable.
Residential site preparation planning will decide which trees, if any, should be left and then the heavy equipment is brought it.
The goal of this first step is to remove all waste vegetation, allowing site preparation contractors to move to the next one.
Stump, Rock, and Structure Removal
Once excess trees and brush are removed from the building site as the project plan dictates, stumps can be either ground or ripped out and any existing structures slated for removal can be torn down and discarded.
Then if there are any large rocks or boulders in the ground where it will interfere with the construction process, excavation services can be brought in to extract them.
At this stage in the project, the goal is for the ground itself to be free of debris and unwanted foliage so that preparation can continue.
Grading and Erosion Control
With the site clear of anything in the way, either on or in the ground, leveling and grading and ground leveling if necessary can begin.
This last part of the physical land clearing process shapes the land in relation to where the actual building pad will be located and addresses erosion control.
Depending on the natural typography and condition of the ground after the above steps, this process could involve extensive excavating services to build up some areas and level others or minimal work and leaving the land as it is.&
Drainage and Utility Installation
After grading and erosion mitigation has been addressed, required drainage for the structure to be built will be put in and then utility lines afterward.
Sewer, drainage, and utility line installation are the final step of residential site preparation before the actual construction can begin.
Then after the foundation is installed and the structure is built, a final grading and landscape installation will occur.
Residential Site Preparation Involves Many Steps
Building a home on raw land involves a land clearing and development process consisting of multiple essential steps.
Every plot of land will have different challenges to address and the cost of these land clearing, installation, and excavation services will vary greatly.
The final result will be a plot of ground that is ready to build on with a low chance of issues that could be detrimental to the home that will be built there in the near future.
To prevent problems related to ground shifting, erosion, and drainage issues later, residential site preparation must be done carefully, by experienced land clearing and site development contractors.